Case Study Search Results for Marine

Advanced search

결과 1 - 10 of 33

  1. Land Rover BAR (Ben Ainslie Racing) Integration Case Study

    Siemens PLM Software solutions enable critical performance
    improvements to continue right up to race day.

    41k | https://www.plm.automation.siemens.com/ko/about_us/succes...
  2. Mercury Marine (Supplier Integration) Case Study

    With streamlined supplier sourcing and integration, Mercury Marine reduces
    new product introduction costs and accelerates time-to-market.

    38k | https://www.plm.automation.siemens.com/ko/about_us/succes...
  3. Longitude Engineering Case Study

    LOC Group member, Longitude Engineering, uses Siemens PLM Software
    technology to optimize efficient global collaboration for business growth.

    38k | https://www.plm.automation.siemens.com/ko/about_us/succes...
  4. Doosan Engine / 두산엔진 성공사례

    PLM과 CAD의 유기적 연동으로 설계 생산성 향상 및 3D
    기반의 가상제품개발 환경 구현을 위한 기반 다져.

    39k | https://www.plm.automation.siemens.com/ko/about_us/succes...
  5. A4 Construction Design Office Case Study

    Siemens PLM Software solutions help improve
    quality, accelerate ship development.

    35k | https://www.plm.automation.siemens.com/ko/about_us/succes...
  6. Noise Control Engineering LLC Case Study

    State-of-the-art LMS testing tools help optimize noise-reduction
    solutions and improve working conditions for the crew.

    41k | https://www.plm.automation.siemens.com/ko/about_us/succes...
  7. Land Rover BAR (Ben Ainslie Racing) Case Study

    Siemens PLM Software solution enables complex design and analysis to help
    optimize sailboat performance for one of the world's most revered sailing ...

    44k | https://www.plm.automation.siemens.com/ko/about_us/succes...
  8. Princess Yachts Case Study

    Princess elegantly balances attention to detail
    and speed with NX and Teamcenter.

    41k | https://www.plm.automation.siemens.com/ko/about_us/succes...
  9. Daewoo Shipbuilding and Marine Engineering Case Study

    지멘스 PLM의 최신 IT 기술 융합을 통한 비용 절감 및 시간
    단축 통해 생산성 극대화 및 시장경쟁력 강화.

    37k | https://www.plm.automation.siemens.com/ko/about_us/succes...
  10. MAN Diesel & Turbo Case Study

    Ability to simulate both gas and liquid fuel injection using LMS
    Imagine.Lab Amesim also significantly reduces testing costs.

    37k | https://www.plm.automation.siemens.com/ko/about_us/succes...
Close share layer

Share this page

Share this page through any of the following channels.

Bookmarking Sites

Communities

News

Blogs & Microblogs