Skip over secondary navigation

Secondary navigation

Skip over Content

Content

Customer Videos

All Customer Videos

Alloy Total Product Design

Alloy Total Product Design

NX supports Alloy’s holistic approach to innovation, dramatically reducing strategic development time.

Andretti Green Racing

Andretti Green Racing

Siemens PLM Software helps Andretti Green Racing manage part data.

ATK

ATK

Delivering innovation and mission success with Teamcenter.

Autocar

Autocar

Rapid innovation yields 30 percent market share gain. 

BAE Systems

BAE Systems

Teamcenter Supports Aircraft through 50-year Lifecycle

BSH

BSH

Thriving in a global world requires more than fast time to market.

Black Diamond Equipment

Black Diamond Equipment Ltd.

Boundary-free product design. 

Bolzoni Auramo

Bolzoni Auramo

Lift-truck attachment manufacturer creates global platform for growth.

Consolidated Container Company

Consolidated Container Company

NX Supporting Faster Pantent Processes

Daher Aerospace

Daher Aerospace

Teamcenter connects global engineering and manufacturing sites

Daimler Chrysler

DaimlerChrysler

Simulation in Automotive

ebm-papst

ebm-papst

Manufacturer of fans and motors optimizes production with Tecnomatix.

Emergent Systems

Emergent Systems

Left behind without knowledge

Emerson Corporation

Emerson Corporation

1. Using Teamcenter frees up 33% of engineering resources
2. Compliance in product development

Europrop

Europrop International (EPI)

Teamcenter: Demonstrating Airwothiness

Everdigm

Everdigm

Faster cycle times made possible by Solid Edge, Femap and Teamcenter Express improve customer responsiveness.

FEI

FEI

Product Lifecycle Management in a global machinery environment where Ångström precision counts

Ford Motor Company

Ford Motor Company

$100+ million in warranty cost savings.

Hella KGaA Hueck & Co.

Optimizing the production process is critical to this automotive supplier's ability to remain competitive and profitable in challenging times.

Hendrick Motorsports

Hendrick Motorsports

Hendrick Motorsports uses Siemens PLM Software for end-to-end product development and for winning results.

Hitachi

Hitachi

Application Integration

Indak Manufacturing

Indak Manufacturing

1. The Massive Power of NX
2. Usability

Joe Gibbs Racing

Joe Gibbs Racing

Joe Gibbs Racing uses NX and Teamcenter for racing success.

Keyox

Keyox

Innovation in the service of product development.

KB Racing

KB Racing

From concept to success, KB Racing uses Siemens PLM Software for part design and development.

Lanco Assembly Systems

Lanco Assembly Systems

Modeling solution's ease of use in significant cycle time reduction

Lockheed Martin

Lockheed Martin

X-35 (Joint Strike Fighter)

MAN B&W Diesel

MAN B&W Diesel

Using the benefits of NX by transforming the entire digital product development process

Nissan

Nissan

Continuous improvement – design through delivery

Pilatus Aircraft

Pilatus Aircraft

Siemens PLM Software allowed a deeper level of integration between the CAD and CAM system

Quantum Signal

Quantum Signal

Capturing and deploying knowledge worldwide

Royal Australian Navy

Royal Australian Navy

RAN revolutionizes its process management

Sandvik

Sandvik

Engineering Re-Use

Schatti AG

Schatti AG

Solid Edge, Teamcenter Express and CAM Express solve Schatti’s problems

Siemens

Siemens

1. The evolution of NX
2. NX - Intuitive and Robust

Stockli Swiss Sports AG

Stockli Swiss Sports AG

Solid Edge makes Stockli more competitive

Tesco

Tesco

Tecnomatix plays a vital role in Tesco's PLM strategy

Titleist

Titleist

1. Discerning Players and Modeling Accuracy
2. NX Modeling Flexibility
3. Processes Prototypes and Time to Market

Unilever

Unilever

Achieving innovation and growth through PLM

VAI CLECIM

VAI CLECIM

Moving to Solid Edge for 3D

Volvo

Volvo

Knowledge fusion revolutionizes the way Volvo does engineering

Wescast Industries

Wescast Industries

Capture business needs cradle-to-grave

Wright Medical Technology

Wright Medical Technology

1. New Orthopedic Solution
2. Parallel Development
3. Time Savings


Context