Anglo Platinum wanted to automate repetitive design tasks
In the past, Anglo Platinum designers created the highlevel design for platinum mines using a 2D design tool that required every section, elevation and isometric drawing to be produced from scratch. When design changes were issued, many drawings were often affected and each of them had to be redone. Cost estimates required going through the drawings one by one and entering material items into a spreadsheet.
“The main reason for moving to 3D,” says Len Pretorius, General Manager Project Services for Anglo Platinum, “was to be able to cut and paste past designs into new projects. The parametric capabilities of Solid Edge make the job easier by allowing us to create libraries of common assemblies that we can simply plug new numbers into the system to fit the current design. The 3D model provides a much higher level of visibility than we were able to achieve in the past and, best of all, we can generate construction drawings once the design is approved in an automated process.”
It costs about $160 million to build a platinum mine and the costs increase between six and 10 percent per year over the life of the project. By designing in 3D, Anglo Platinum reduced the time needed to design a mine by six to 12 months. The total savings, from reduced engineering costs, lower construction costs and getting the mine into production faster amounted to about $2 million per month.

Download the PDF:
Challenges:
Keys To Success:
Results:
Industry:
Client's Primary Business:
The Anglo Platinum group is the world’s leading primary producer of platinum group metals, with operations, comprising six mines, two smelters, a base metals refinery and a precious metals refinery, all situated in the Limpopo and North West provinces of South Africa.
Business Initiatives:
Solutions/Services:
Client Location:
Christchurch
New Zealand
"Switching to 3D design has helped us reduce the time required to design, fabricate and construct a 200,000 ton per month mine complex significantly."
Len Pretorius
General Manager Project Services
Anglo Platinum
"The main reason for moving to 3D was to be able to cut and paste past designs into new projects."
Len Pretorius
General Manager Project Services
Anglo Platinum
5800 Granite Parkway
Suite 600
Plano, TX
75024
(v): +1 800 498 5351